Hangzhou East Railway Station is the largest railway station in Asia. At the beginning of the design, it was necessary to consider working under dense dynamic loads such as high-speed trains and subways after completion. The basement has three floors and a depth of 20 meters, so the requirements for waterproof design and construction are very high; The total waterproof construction area is 320000 square meters.
Main material selection:
"Lvdu" polymer cement waterproof coating (JS)
"Lvdu" self-adhesive polymer modified asphalt waterproofing membrane
"Lvdu" EPDM waterproof roll material
"Lvdu" PVC waterproof roll material (PVC)